The Gailey bridge project replaced a river ford (moving farming equipment by driving across the river bed) with a bridge over the Touchet River. This greatly reduced sediment delivery to the river which was highly beneficial to endangered fish species. Funding was provided by the landowner and the WA State Conservation Commission.